SR 80 (Southern Blvd) Bridge Replacement Project

Home / Photos

Photos

<

Construction Photos (July 2017)

A portion of Bingham Island is used for storage of equipment and materials.
Additional barges and cranes are mobilized north of the existing drawbridge.
A new barge is assembled at the Port of Palm Beach.
Light poles are removed from the Southern Boulevard Causeway.
A temporary wall is assembled east of the existing drawbridge.
Installing piles at Pier 21 of the temporary bridge.